Heavy Fuel Oil Installation

  • Client: Fiji Electricity Authority
  • Year: 2007/8

Complete design build project incorporating civil, structural, mechanical, electrical and control system works.  Civil works involved: clearing site; stabilisation of the ground; foundations and construction of bunded area; and access roading.  Structural works covered the kits set construction of 1 x 1.3mil litre tank, in NZ, and shipping to Fiji, along with 4 smaller 30kl and 50kl tanks. It also covered the installation of all connecting pipework and pipe support bridges.  Electrical and control systems covered connection of pumps, actuators, flow meters, level sensors, tank heating elements etc.

 

FEA tanks and pipework4.jpg

Heavy Fuel Oil Installation - Gallery